The heron was by the pond in our back yard most of the day so this afternoon I got the camera and headed outside and was lucky enough to get some good shots
The Zen Hua carrying four massive cranes that will be installed at the Port of Baltimore. The bridge was shut down for 30 minutes so the ship could sail under the bridge. There was only about 10 feet clearance. There was a big crowd of people on shore watching the ship sail up the bay